TOYO GOSEIのトップページへ
Site search
Powered by Google
Site Map Japanese Change Font Size
TOP > Topics

Topics

« Strengthening of Company Internal Educational System (Basic Chemistry Courses and Chemical Engineering Courses) | main | Fully Automated Drum Filling Facility Completed (April 2003) »

Blending Tank Completed (April 2003)

At this time, the facilities with a 25KL x SUS 304 mixing vat with agitator machine and heating, cooling, heat holding functions and odor removal tower have been completed.

In addition to bringing in products with trucks in ISO containers, it is also possible to connect to the 61 storage tanks with dedicated pipes, so these facilities can handle various oil mixing operations. In addition to Type 1 oil, these facilities can also handle high hazard chemicals, highly reactive chemicals, highly odorous chemicals, and other difficult to handle chemicals. We also carry out analysis work with our technology to make the quality of the work even more certain.

TrackBacks

Trackback URL of this entry:
http://www.toyogosei.co.jp/cgi-bin/blog/topic-en/mt-tb.cgi/23

Copyright (C) 2008 Toyo Gosei Co., Ltd. All rights reserved